-
Case Studies , Professional blog 12/27/2020
SERVICE STATION COFFEE MACHINES ( Sanispeed)
OBJECTIVE: Achieving drainage for new coffee machines in service station nation-wide. CHALLENGE: Plumbing needed in existing stores with no plumbing ports. SOLUTION Sanispeed
Read more -
Case Studies , Professional blog 12/23/2020
BASEMENT CONVERSION TO GRANNY FLAT ( Sanicubic2 Pro)
OBJECTIVE: Create a private retreat/multipurpose space. CHALLENGE: Plumbing needed under the sewerage and stormwater mains. SOLUTION: Sanicubic 2 Pro WP.
Read more -
Case Studies , Professional blog 12/17/2020
LUXURY CABIN ( Sanicubic1)
OBJECTIVE: To renovate the heritage cabins and create an inclusive luxurious experience CHALLENGE: Plumbing solution required for the elevated bathroom drainage
Read more -
Case Studies , Professional blog 12/16/2020
MEDISTAY HOSPITAL ACCOMODATION ( Sanipack)
OBJECTIVE: Create all-inclusive accommodation for families visiting hospital patients. CHALLENGE: Plumbing needed in a multistorey office building SOLUTION: Sanipack
Read more -
Case Studies , Professional blog 12/15/2020
END OF TRIP FACILITY ( Sanishower)
OBJECTIVE: Create an end of trip facility complete with showers. CHALLENGE: Plumbing needed in the basement of a multistorey office building. SOLUTION: Sanifloor
Read more