-
Case Studies 01/23/2023
UPPER LIMB CLINIC ( Sanispeed, Saniaccess3 and Sanicom1)
Securing a modern space on the top floor of a high rise with great exposure leading into the city is a dream for most. For a clinic and day surgery, this presents its own set of challenges. Creating a purpose-built clinic equipped with sterilising machines, washbasins, bathrooms and kitchenettes required multiple plumbing solutions. Dr Maguire did not anticipate plumbing to be a problem when he embarked on his new clinic fit-out.
Read more -
Case Studies 01/23/2023
Greenhouse by Joost Bakker
SFA Australia was recently involved in the innovative future food system Greenhouse project by zero-waste champion Joost Bakker. The closed loop, three-storey, two-bedroom home has the capacity to grow and cultivate fruit, vegetables, herbs, fish, mussels and snails, and all in an 87-square-metre footprint.
Read more -
Case Studies 06/14/2022
Sanispeed + commercial grey water pump & 7-eleven national smoothie machine roll out
OBJECTIVE:To offer ease of installation of smoothie machines in store nationally. CHALLENGE: Lack of traditional gravity drainage connections where required. SOLUTION: Sanispeed+
Read more -
Case Studies 06/14/2022
Sanicubic 1GR helps homeowners turn a boatshed into guest accomodation
Objective: To convert an existing boatshed into guest accommodation Challenge: Installation of a bathroom and kitchen without access to traditional plumbing Solution: Sanicubic 1GR
Read more -
Case Studies 08/23/2021
Office Space Transformed into Fully Equipped Doctor’s Clinic (Sanifast)
Office Space Transformed into Fully Equipped Doctor’s Clinic without adequate traditional plumbing
Read more